Skip Navigation LinksCapital Program Management and Design & Development Services Intranet
  
  
  
  
  
Edit
Document Collection: DOWNWIND WAY AND LA JOLLA SHORES DRIVE INTERSECTION IMPROVEMENTS - Prequalification of Contractors
  
DOWNWIND WAY AND LA JOLLA SHORES DRIVE INTERSECTION IMPROVEMENTS (Prequalification of Contractors)W10014782/P4S-8557/2/2019 4:00 PM 
Document Collection: TATA HALL 2ND FLOOR UTILITY UPGRADE and 4TH-6TH FLOOR T.I. (Prequalified of Contractor)
  
TATA HALL 2ND FLOOR UTILITY UPGRADE and 4TH-6TH FLOOR T.I. (Prequalified of Contractor)5303/A4L-488/9631907/1/2019 2:00 PM 
Document Collection: LA JOLLA SHORES SLOPE REPAIR (Prequalification of Contractors)
  
LA JOLLA SHORES SLOPE REPAIR (Prequalification of Contractors)5282/A4L-509/9661176/27/2019 4:00 PM 
Document Collection: Sverdrup Hall Restroom Remodel and ADA Improvements (Prequalification of Contractors)
  
Sverdrup Hall Restroom Remodel and ADA Improvements (Prequalification of Contractors)W9995639 / P4L-2036/26/2019 4:00 PM 
Document Collection: MAYER HALL STUDENT SUCCESS CENTER (Phase2)_ PreQualification of Subcontractor and Bid Packages
  
MAYER HALL STUDENT SUCCESS CENTER (Phase2)_ PreQualification of Subcontractor and Bid Packages5324/A4L-507/9633606/20/2019 2:00 PM 
Document Collection: 5149 DESIGN AND INNOVATION BUILDING - Various Interior Bid Pkgs. (Prequalification)
  
DESIGN AND INNOVATION BUILDING - Various Interior Bid Pkgs. (Prequalification of Subcontractors)5149/A4L-462/9627706/19/2019 2:00 PM 
Document Collection: PRICE CENTER SEWER IMPROVEMENTS (Prequalified Contractors)
  
PRICE CENTER SEWER IMPROVEMENTS (Prequalified Contractors)5316 /A4L-504/9661166/18/2019 2:00 PM 
Document Collection: 5149 DESIGN AND INNOVATION BUILDING BP 31.20 SWPPP (Prequalified Subcontractors)
  
DESIGN AND INNOVATION BUILDING BP 31.20 SWPPP (Prequalified Subcontractors)5149/A4L-462/9627706/12/2019 2:00 PM 
Document Collection: TPCS 2ND FLOOR RENOVATIONS - PHASE 2 _ PreQualified Subcontractors
  
TPCS 2ND FLOOR RENOVATIONS - PHASE 2 _ PreQualified Subcontractors5291/A4L-487/9627206/11/2019 2:00 PM 
Document Collection: 5149 DESIGN AND INNOVATION BUILDING BP 03.00 Concrete (Prequalified Subcontractors)
  
DESIGN AND INNOVATION BUILDING BP 03.00 Concrete (Prequalified Subcontractors)5149/A4L-462/9627706/10/2019 2:00 PM 
Document Collection: 5149 DESIGN AND INNOVATION BUILDING BP 01.71 Surveying (Prequalified Subcontractors)
  
DESIGN AND INNOVATION BUILDING BP 01.71 Surveying  (Prequalified Subcontractors)5149/A4L-462/9627706/10/2019 2:00 PM 
Document Collection: 6333 AND 6363 GREENWICH DUE DILIGENCE (Prequalified CM Contractors)
  
6333 AND 6363 GREENWICH DUE DILIGENCE (Prequalified CM Contractors)5311/A4L-508/9633006/10/2019 2:00 PM 
Document Collection: The Preuss School PV Solar Power (Prequalified Contractors)
  
The Preuss School PV Solar PowerW9996389 / P4S-8666/6/2019 2:00 PM 
Document Collection: 5149 DESIGN AND INNOVATION BUILDING BP 14.20 Elevators (Prequalified Subcontractors)
  
DESIGN AND INNOVATION BUILDING BP 14.20 Elevators (Prequalified Subcontractors)5149/A4L-462/9627706/5/2019 2:00 PM 
Document Collection: PEPPER CANYON AMPHITHEATER AND PUBLIC REALM _ PreQualified CM-Contractors
  
PEPPER CANYON AMPHITHEATER AND PUBLIC REALM _ PreQualified CM/Contractors5266/A4L-497/9631206/5/2019 10:00 AM 
Document Collection: JOC FM20 Main Campus General Civil Maintenance and Upgrades (Prequalification of Contractors)
  
JOC FM20 Main Campus General Civil Maintenance and Upgrades (Prequalification of Contractors)W10027604 / FM20 / P4L-2015/30/2019 4:00 PM 
Document Collection: CNCB Renew Air Handlers (Prequalification of Contractors)
  
CNCB Renew Air Handlers (Prequalification of Contractors)1000804582 / P4L-2025/30/2019 4:00 PM 
Document Collection: Health Science Memorial Site (Prequalified Contractors)
  
Health Science Memorial Site (Prequalified Contractors)W10013049 P4M-12315/30/2019 2:00 PM 
Document Collection: 5149 DESIGN AND INNOVATION BUILDING BP 08.50 Curtainwall and Storefront (Prequalified Subcontractors)
  
DESIGN AND INNOVATION BUILDING BP 08.50 Curtainwall and Storefront (Prequalified Subcontractors)5149/A4L-462/9627705/29/2019 2:00 PM 
Document Collection: 5149 DESIGN AND INNOVATION BUILDING BP 07.42 Metal Panels (Prequalified Subcontractors)
  
DESIGN AND INNOVATION BUILDING BP 07.42 Metal Panels (Prequalified Subcontractors)5149/A4L-462/9627705/29/2019 2:00 PM 
Document Collection: 5149 DESIGN AND INNOVATION BUILDING BP 02.45 Ground Improvements (Prequalified Subcontractors)
  
DESIGN AND INNOVATION BUILDING BP 02.45 Ground Improvements  (Prequalified Subcontractors)5149/A4L-462/9627705/29/2019 2:00 PM 
Document Collection: RIDGE WALK IMPROVEMENTS, MUIR-REVELLE _ PreQualified CM-Contractors
  
RIDGE WALK IMPROVEMENTS, MUIR-REVELLE _ PreQualified CM-Contractors5179/A4L-502/9660955/28/2019 2:00 PM 
Document Collection: 5149 DESIGN AND INNOVATION BUILDING BP 31.60 Tiedown Anchors and Shoring (Prequalified Subcontractors)
  
DESIGN AND INNOVATION BUILDING BP 31.60 Tiedown Anchors and Shoring (Prequalified Subcontractors)5149/A4L-462/9627705/20/2019 2:00 PM 
Document Collection: 5149 Design and Innovation Building-SWPPP (Prequalification of Subcontractors)
  
Design and Innovation Building-SWPPP (Prequalification of Subcontractors)5149/A4L-462/9627705/20/2019 2:00 PM 
Document Collection: CAL IT2 and APM Building E Gap (Prequalification of Contractors)
  
CAL IT2 Facility E Gap & AP&M Building E Gap (Prequalification of Contractors)1000768055 / P4L-199 & 1000768051 / P4L-2005/9/2019 4:00 PM 
Document Collection: Campus Crosswalk ADA Button Repleacement
  
Campus Crosswalk ADA Button Replacement1000994644 / P4M-12305/9/2019 2:00 PM 
Document Collection: 5149 Design and Innovation Building-Survey (Prequalification of Subcontractors)
  
Design and Innovation Building-Survey (Prequalification of Subcontractors)5149/A4L-462/9627705/7/2019 2:00 PM 
Document Collection: MAYER HALL STUDENT SUCCESS CENTER _ PreQualified CM-Contractors
  
MAYER HALL STUDENT SUCCESS CENTER _ PreQualified CM-Contractors5324/A4L-507/9633605/7/2019 2:00 AM 
Document Collection: ELLIOTT FIELD ENGLEKIRK SHAKE TABLE UPGRADE (Prequalification of Contractors)
  
ELLIOTT FIELD ENGLEKIRK SHAKE TABLE UPGRADE (Prequalification of Contractors)5306 / A4L-503 / 9632105/1/2019 4:00 PM 
Document Collection: VOIGT HYDRONIC LOOP - RECLAIMED WATER EXPANSION PHASE 3  (Prequalification of Contractors)
  
VOIGT HYDRONIC LOOP - RECLAIMED WATER EXPANSION PHASE 3  (Prequalification of Contractors)5188/ A4L-505 / 966120 & 5198/ A4L-506/ 9661124/25/2019 4:00 PM 
1 - 30Next