Bid Information for Job: VOIGT HYDRONIC LOOP - RECLAIMED WATER EXPANSION PHASE 3 (Prequalification of Contractors)

Project Number5188/ A4L-505 / 966120 & 5198/ A4L-506/ 966112
Project NameVOIGT HYDRONIC LOOP - RECLAIMED WATER EXPANSION PHASE 3 (Prequalification of Contractors)
Bid Date4/25/2019 4:00 PM
Mandatory Meeting: Yes4/17/2019 1:30 PM
Project Description
**REVISED**
ADVERTISEMENT FOR PREQUALIFICATION OF CONTRACTOR
(NO SUBCONTRACTOR BIDS REQUESTED AT THIS TIME)

Subject to conditions prescribed by the undersigned, Prequalification Questionnaires from Contractors licensed as follows:

 A- GENERAL ENGINEERING CONTRACTOR

are invited for the following work:

UNIVERSITY OF CALIFORNIA, SAN DIEGO

VOIGT HYDRONIC LOOP
Project No. 5188/ A4L-505 / 966120

RECLAIMED WATER EXPANSION PHASE 3
(PORTION OF CAMPUS RECLAIMED WATER WORK)
Project No. 5198/ A4L-506/ 966112

Estimated Total Construction Cost: $6,000,000

PROJECT DESCRIPTION:

The scope of this project provides a new 18” dia. campus direct-bury chilled water loop between Hopkins Drive and Atkinson Hall following along Voigt Drive and Engineer Lane.  The project installs an 8” dia. reclaim water service extension from Hopkins Drive to the intersection of Voigt Drive and Engineer Lane where it then splits line size north, towards the FAH site and south, towards the Warren Mall area.  Finally, the project installs a Telecommunications duct bank system from an existing vault at Hopkins Drive to the Franklin Antonio Hall site and points south from the intersection at Voigt Drive and Engineer Lane.  Vaults for each service are installed per the drawings at various locations as required for each utility distribution system.

The University seeks Contractors with demonstrated experience with the installation of underground utility infrastructure in active public streets, bike paths, and thoroughfares, and chilled water piping installation and connection of active campus wet utility systems while not impacting operations.  Specific experience requirements include: installation of underground Large Bore HDPE chilled water systems, reclaimed water utility systems, Data/Telecom Duct Bank Systems, precast and Cast-In-Place underground concrete utility vaults, relocation of existing underground utility relocation and interconnection to operational hydronic systems. 

Estimated Project Duration: Phase 1 - Eight (8) months; Phase 2 – Three (3) months with a one year lag between phases.

The Contractor shall have demonstrated an average annual business revenue of at least $20,000,000 over the last five (5) consecutive years. The Contractor must have demonstrated experience on a minimum of three (3) comparable projects with the Contractor providing services as A - General Engineering Contractor within the last ten (10) years. Projects should have possessed the following construction challenges: urban site work with limited construction and staging area, project complexity requiring critical path construction scheduling to complete on time, repair of utilities requiring proactive and innovative solutions due to noise, dust, and pedestrian traffic while building is occupied and research is ongoing, project complexity requiring tracking of multiple functions and phases, project complexity requiring critical path construction scheduling to complete on time, and complex phasing plan development and execution.

Prequalification Questionnaires will be received only at the following address:

CAPITAL PROGRAM MANAGEMENT
UNIVERSITY OF CALIFORNIA, SAN DIEGO
10280 N. Torrey Pines Road, Ste. 465
Contracts Department (MC 0916)
La Jolla, CA 92037
Attention: Kari Sarmiento (Contract Administrator)

No Prequalification Questionnaire will be received after 4:00 P.M., THURSDAY, APRIL 25, 2019.

Confidentiality of the information provided will be respected to the extent permitted by law.

Response to the Prequalification Questionnaire must be submitted on the forms contained within the Prequalification Questionnaire available at the address above.

All information requested in these forms must be provided in order to be considered "responsive" to the requirements of the prequalification.  The University contacts are Rick Lyons, Project Manager, Capital Program Management (858) 822-4834 or Rhonda Mitchell, Contracts Manager, Capital Program Management (858) 822-3126.

A mandatory Prequalification Conference will be conducted on FRIDAY, APRIL 12, 2019, at 10:30 A.M. at Capital Program Management, 10280 N. Torrey Pines Rd., Ste 466, Large Conference Room, La Jolla, CA 92037.  Campus maps can be found at http://maps.ucsd.edu.

A second mandatory Prequalification Conference will be conducted on Wednesday, April 17, 2019 at 1:30 p.m.

*If your firm attended the initial Prequalification Conference on Friday, April 12, 2019, it is not mandatory to attend the 2nd mandatory Prequalification Conference.

Attendance at the Prequalification Conference is mandatory for Contractors attempting to become prequalified to bid on this specific project.

Metered parking spaces are available (for up to 2 hours) in the service yard/shuttle stop parking lot and underground parking area of Torrey Pines Center South.  Please allow ample time to secure parking. Contractors must be present for the entire conference.

UC San Diego encourages the participation of Small, Disadvantaged, Minority-owned, Women-owned and Service/Disabled Veteran-owned Business Enterprises (S/D/M/W/DVBE’s) and is committed to promote a diverse pool of firms for our building programs. Potential bidders will be required to submit their small business outreach plan to the University as part of the prequalification process.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy.  Each Bidder may be required to show evidence of its equal employment opportunity policy.  The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work.

The work described in the contract is a public work subject to section 1771 of the California Labor Code.

ALL CONTRACTORS AND SUBCONTRACTORS MUST BE REGISTERED WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) AT BID TIME.
Go to http://www.dir.ca.gov/public-works/publicworks.html for more information and to register.

No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour as of 10/1/17) and shall comply with all applicable federal, state and local working condition requirements.


THE REGENTS OF THE UNIVERSITY OF CALIFORNIA
APRIL 2019

Project ContactKari Sarmiento
Project Street Address
Project Phone Number858.246.0988
Project Fax Number
Date Documents will be available4/4/2019
License Requirement A- GENERAL ENGINEERING CONTRACTOR
Estimated Construction Cost$6,000,000
  
  
  
collapse Content Type : Prequalification Questionnaire ‎(2)
5188 Staff Summary Table 2018-05-01.xls
  
69 KB
REVISED 5188 - PQ Questionnaire - RNL changes 04-02-19.doc
  
163 KB
collapse Content Type : Document ‎(1)
REVISED 5188 - PQ Advertisement RNL changes 04-02-19.pdf
  
110 KB
collapse Content Type : Mandatory Meeting Signin Sheet ‎(2)
5188 Sign-In Sheet-Mandatory Prequal Mtg 2019-04-12.PDF
  
546 KB
5188 Sign-In Sheet-Mandatory Prequal Mtg 2019-04-17.PDF
  
341 KB
collapse Content Type : Addendum ‎(1)
5188 Voigt Hydronic Loop PQ - Addendum 1.pdf
  
558 KB
NameAddressPhone #Contact
A.O. Reed & Co.4777 Ruffner Street, San Diego, CA 92111 Phil Trinh
HPS Mechanical, Inc.3100 E. Belle Terrace, Bakersfield, CA 92126Scott DenHerder
James W. Fowler Co.12775 Westview Drive, Dallas, OR 97338Sondra Jameson
McCarthy Building Companies, Inc.9275 Sky Park Court, Ste. 200, San Diego, CA 92123Robert Betz
The Ryan Co.15 Commerce Way, Norton, MA 02799Jamie Craig