Issue Date 5/5/20175/5/2017
Due Date 5/22/2017
Project Title 5104 Thornton Plumbing Piping Replacement - MCLJ
RFQ Text REVISED


UC San Diego will be selecting an Executive Engineer to perform design, construction drawings, bid, and construction phase services for the replacement of original building sewer piping at interstitial floors of the existing Thornton Pavilion, an operational hospital at 9300 Campus Point Drive, La Jolla, California. 

This project consists of replacing original cast iron building sewer piping and connections at interstitial floors, addition of cleanouts where requested by the University, and installation of pipe supports as required by new work.  Approximate gross square footage served by interstitial floors is 100,000 square feet.  The estimated construction cost is $1,500,000 at CCCI 6373. The project is subject to the campus/university academic and administrative approval process.

Please visit our website at www.fdc.ucsd.edu, select the Contracting Opportunities tab and then Active Request for Qualifications, under Design Professionals to access the following documents:  Request for Qualification package, University Form Attachments A & B, and a sample Standard Form 330 for your use if you choose to submit a proposal. 
 
Proposals are due no later than 4:00 p.m., Monday, May 22, 2017.

Final selection and appointment is contingent upon project approval.

UC San Diego encourages the participation of Small, Disadvantaged, Minority-owned, Women-owned and Service/Disabled Veteran-owned Business Enterprises (S/D/M/W/DVBE’s) and is committed to promote a diverse pool of firms for our building programs.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy.  Each Bidder may be required to show evidence of its equal employment opportunity policy.  The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work.
The work described in the contract is a public work subject to section 1771 of the California Labor Code.
Phase CompleteComplete
Selection Process E/E SelectionE/E Selection
Download 5104 TH Plumbing Piping Replacement - RFQ Engineer - Final Rev. 5-12.pdf
  
  
  
  
Randall Lamb Associates
MA Engineers, Inc
Shadpour Consulting Engineers, Inc.
  
  
  
  
Randall Lamb Associates
There are no items to show in this view.