Issue Date 10/4/201710/4/2017
Due Date 10/19/2017
Project Title 5223 I-5 ELECTRICAL SWITCH STATION
RFQ Text The University of California, San Diego, will be selecting an Executive Electrical Engineer to perform site study, project planning, design, bid and construction administration services for the construction of the new I-5 12KV Electrical Switch Station.  UC San Diego is experiencing rapid growth in faculty, student, and sponsored research activities, resulting in a steady projected. 

The project includes construction of a new 12KV Electrical Switch Station to be located on the west side of Interstate 5.  The new 12KV Electrical Switch Station will be served from the Campus Cogen system via existing Revelle Switch Station and will also receive power from San Diego Gas & Electric Company (SDG&E) via UCSD East Campus 69/12.47KV Main Substation.  The new 12KV Electrical Switch Station  will supply power to the existing North Campus Switch Station and from time to time to the existing Revelle Switch Station depending on existing co-gen system operations.  This project will also include all associated modification to existing equipment, if required, and underground medium voltage distribution system.

Construction budget is estimated to be approximately $12,000,000 at CCCI 7414.

For your use if you choose to submit a proposal you can access and download the following documents below:  Request for Qualification package and University Form Attachments A & B, and a sample Standard Form 330.
 
Proposals are due no later than 4:00 p.m., Thursday, October 19, 2017.

Final selection and appointment is contingent upon project approval.

UC San Diego encourages the participation of Small, Disadvantaged, Minority-owned, Women-owned and Service/Disabled Veteran-owned Business Enterprises (S/D/M/W/DVBE’s) and is committed to promote a diverse pool of firms for our building programs.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy.  Each Bidder may be required to show evidence of its equal employment opportunity policy.  The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work.

The work described in the contract is a public work subject to section 1771 of the California Labor Code.

Phase CompleteComplete
Selection Process E/E SelectionE/E Selection
Download 5223 I-5 Switch Station - Executive Engineer RFQ Final.pdf
  
  
  
  
Engineering Partners (EPI)
MWE Engineering, Inc. dba Michael Wall Engineering
P2S Engineering, Inc
  
  
  
  
P2S Engineering, Inc.