Issue Date 5/15/20145/15/2014
Due Date 5/30/2014
Project Title 4865 SIO Hubbs Hall 2nd Floor Slab Feasibility Study - Selection of Executive Structural Engineer
RFQ Text UC San Diego will be selecting an Executive Structural Engineer to perform further investigation, programming, planning, designing, bid, and construction phase services for the repair of Hubbs Hall.  The objective of this study is to determine the full extent of and how best to solve the existing structural and related problems.

The work will require leading the effort to investigate the structural and repair issues, design of the new slab and other necessary components, prepare a work and phasing plan, prepare contract documents and provide administrative and problem solving support through the construction phase.  Additionally, the successful applicant will need to document the requirements of the current users, support the effort to relocate the researchers to new facilities (as needed), provide schedules for all parts of the work, including the moves and cost estimates.  Finally the rooms will need to be renovated back into usable space, so coordination with SIO staff and the different scientific disciplines is essential, the resulting rehabilitation/construction work is anticipated to cost in the rough order magnitude of $5M.
 
Please see below to access the following documents:  Request for Qualification package, University Form Attachments A & B, and a sample Standard Form 330 for your use if you choose to submit a proposal. 
 
Proposals are due no later than 4:00 p.m., Friday, May 30, 2014.

Final selection and appointment is contingent upon project approval.

UC San Diego encourages the participation of Small, Disadvantaged, Minority-owned, Women-owned and Service/Disabled Veteran-owned Business Enterprises (S/D/M/W/DVBE’s) and is committed to promote a diverse pool of firms for our building programs.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy.  Each candidate firm may be required to show evidence of its equal employment opportunity policy.

Phase CompleteComplete
Selection Process E/E SelectionE/E Selection
Download 4865 RFQ Hubbs Hall Cracked Slab Study ci edits.pdf
  
  
  
  
Degenkolb Engineers225 Broadway, Suite 1325, San Diego, CA 92101Michael Braund
Englekirk Institutional925 Fort Stockton Drive, Suite 202, San Diego, CA 92103Tony Ghodsi
SDSE3838 Camino Del Rio North, Suite 280, San Diego, CA 92081Christopher Kamp
Thornton Tomasetti, Inc.925 Fort Stockton Drive, Suite 200, San Diego, CA 92103Aaron Beebe
  
  
  
  
SDSE3838 Camino Del Rio North, Suite 280, San Diego, CA 92081Christopher Kamp