Issue Date 8/26/20148/26/2014
Due Date 9/10/2014
Project Title 4798 Central Plant and Cooling Tower, UCSD Medical Center Hillcrest
RFQ Text The University of California, San Diego, will be selecting a Consulting Executive Architect to perform design, construction drawings, bid, and construction phase services for the installation of two 1000 ton Baltimore Aircoil Company cooling towers located at the UCSD Medical Center, Hillcrest, 200 W. Arbor Drive, San Diego, California.  The approximate total construction cost is estimated at $900,000 at CCCI 5961. The project is subject to the Medical Center and OSHPD approval process.

This project consists of the reuse of two existing 1000 ton cooling towers from the Thornton Medical Center, and then installing the towers at the Hillcrest Medical Center Central Plant to increase cooling capacity of the chilled water system.  Once the new cooling towers are in place, an existing tower at the Hillcrest Central Plant will be decommissioned and removed.  The project is intended to provide additional cooling capacity of the central plant for the Hillcrest Medical Center and plan for the eventual replacement of the existing cooling towers that have reached the end of their useful life cycle.  The project will require review and approval from the UCSD Design Review Board.
 
Please see below to access the following documents:  Request for Qualification package, University Form Attachments A & B, and a sample Standard Form 330 for your use if you choose to submit a proposal. 
 
Proposals are due no later than 4:00 p.m., Wednesday, September 10, 2014.

Final selection and appointment is contingent upon project approval.

UC San Diego encourages the participation of Small, Disadvantaged, Minority-owned, Women-owned and Service/Disabled Veteran-owned Business Enterprises (S/D/M/W/DVBE’s) and is committed to promote a diverse pool of firms for our building programs.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy.  Each candidate firm may be required to show evidence of its equal employment opportunity policy.

Phase CompleteComplete
Selection Process E/A SelectionE/A Selection
Download 4798 Architect RFQ.pdf
  
  
  
  