Issue Date 9/4/20149/4/2014
Due Date 9/25/2014
Project Title 4878 Tuolumne Apartments Fire Life Safety Upgrades, Muir College [CANCELLED]
RFQ Text UC San Diego will be selecting an Executive Architect to perform building system investigation, programming, planning, design, bidding assistance, and construction phase services for the renovation of the Tuolumne Apartments. The Tuolumne Apartments, completed in 1975, is an 89,563 gross square foot complex consisting of 9 concrete structure interconnected buildings that serve as a student residence.  The buildings range from 3 to 5 stories, and include a laundry room, elevator tower and office space.  The primary objective of this project is to provide code compliant fire and life safety systems, new interior finishes, exterior structural repairs, upgrade of existing building support systems and ADA compliance where deemed necessary, and scope definition regarding the priority of repairs.   Time is of the essence as the renovation work shall be completed during the summer of 2015 prior to the start of the Fall 2015 quarter.  The estimated construction budget for this project is $8,500,000 at CCCI 5959.

The professional design services will include the following:
1. Project Programming: Building System Investigation and Assessment, Detailed Project Program and Cost Estimate
2. Schematic Design, Cost Estimate, Design Development, Construction Documents, LEED Documentation and submittal to USGBC, Bid and Award Assistance, Construction Administration and Project Closeout.
 
Please see below to access the following documents:  Request for Qualification package, University Form Attachments A & B, and a sample Standard Form 330 for your use if you choose to submit a proposal. 
 
Proposals are due no later than 4:00 p.m., Thursday, September 25, 2014.

Final selection and appointment is contingent upon project approval.

UC San Diego encourages the participation of Small, Disadvantaged, Minority-owned, Women-owned and Service/Disabled Veteran-owned Business Enterprises (S/D/M/W/DVBE’s) and is committed to promote a diverse pool of firms for our building programs.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy.  Each candidate firm may be required to show evidence of its equal employment opportunity policy.
Phase CompleteComplete
Selection Process E/A SelectionE/A Selection
Download 4878 Executive Architect RFQ.pdf
  
  
  
  