Skip Navigation LinksCapital Program Management and Design & Development Services Intranet
  
  
  
  
  
Edit
Document Collection: Birch Aquarium Roof Replacement (Prequalified Contractors Only)
  
Birch Aquarium Roof Replacement (Prequalified Contractors Only)1001051448 / P4L-2302/24/2022 2:00 PM 
Document Collection: CNCB Elevator Modernization and BSB Elevator Renewal (Prequalification of Contractors)
  
CNCB Elevator Modernization and BSB Elevator Renewal (Prequalification of Contractors)1001175800 and 10010514572/23/2022 4:00 PM 
Document Collection: McGill Elevator Smokeguard Installation (Prequalified Contractors)
  
McGill Elevator Smokeguard Installation (Prequalified Contractors)1000804554 / P4L-2292/22/2022 2:00 PM 
Document Collection: Science Engineering Research Facility (SERF) Air Handler Unit (AHU) Replacement (Prequalified Contractors)
  
Science Engineering Research Facility (SERF) Air Handler Unit (AHU) Replacement (Prequalified Contractors)75954 / P4S-2312/15/2022 2:00 PM 
Document Collection: Leichtag Smoke Control System (Prequalified Contractors Only)
  
Leichtag Smoke Control System (Prequalified Contractors Only)1001185020 / P4L-2282/2/2022 2:00 PM 
Document Collection: CENTRAL UTILITIES PLANT EXPANSION CHILLER ADDITION (Prequalified Contractors)
  
CENTRAL UTILITIES PLANT EXPANSION CHILLER ADDITION (Prequalified Contractors)5249 / 966107 2/1/2022 2:00 PM 
Document Collection: Cognitive Science Building (CSB) Suite 212-213 Renovation (Prequalified Contractors Only)
  
Cognitive Science Building (CSB) Suite 212-213 Renovation (Prequalified Contractors Only)86395 / P4S-9041/28/2022 10:00 AM 
Document Collection: Hillcrest Campus Redevelopment Phase 1-Prequalified Subcontractors-03301 Concrete and Reinforcing Steel Parking Structure
  
Hillcrest Campus Redevelopment Phase 1-Prequalified Subcontractors-03301 Concrete and Reinforcing Steel Parking Structure51711/25/2022 2:00 PM 
Document Collection: DISTRIBUTED ENERGY RESOURCES (DER) CONNECTS AND MICROGRID  (Bldg Electrical-Sub Metering Prequalified Subcontractors)
  
DISTRIBUTED ENERGY RESOURCES (DER) CONNECTS AND MICROGRID  (Bldg Electrical-Sub Metering Prequalified Subcontractors)5433 / Electrical Sub-Metering OPZ5-00121/24/2022 5:00 PM 
Document Collection: CONVERGE GOVERNOR PARK 6165 SUITE 200 ATLAS TENANT IMPROVEMENT (Prequalified Contractors)
  
CONVERGE GOVERNOR PARK 6165 SUITE 200 ATLAS TENANT IMPROVEMENT (Prequalified Contractors)55261/21/2022 10:00 AM 
Document Collection: Hillcrest Campus Redevelopment Phase 1-Subcontractor Prequalification (Wave 6B)
  
Hillcrest Campus Redevelopment Phase 1-Subcontractor Prequalification (Wave 6B)51711/17/2022 12:00 PM 
Document Collection: VITERBI FAMILY VISION RESEARCH CENTER (Prequalified Contractors)
  
VITERBI FAMILY VISION RESEARCH CENTER (Prequalified Contractors)53011/14/2022 2:00 PM 
Document Collection: SERF Air Handler Unit (AHU) Replacement and BSB AHU-12 Replacement (Prequalification of C-20 Contractor)
  
SERF Air Handler Unit (AHU) Replacement and BSB AHU-12 Replacement (Prequalification of C-20 Contractor)75954 and 759711/14/2022 12:00 PM 
Document Collection: Hillcrest Campus Redevelopment Phase 1-  Suspended Ceilings Subcontractor Prequalification
  
Hillcrest Campus Redevelopment Phase 1-  Suspended Ceilings Subcontractor Prequalification51711/5/2022 4:00 PM 
Document Collection: Mandeville Art Gallery Renovation - Subcontractor Bid Packages (Prequalified Subcontractors)
  
Mandeville Art Gallery Renovation - Subcontractor Bid Packages (Prequalified Subcontractors)532912/21/2021 5:00 PM 
Document Collection: DISTRIBUTED ENERGY RESOURCES (DER) CONNECTS AND MICROGRID  (LED Upgrades-Prequalified Subcontractors)
  
DISTRIBUTED ENERGY RESOURCES (DER) CONNECTS AND MICROGRID  (LED Upgrades-Prequalified Subcontractors)5433 / OPZ5-0012 LED Upgrades12/17/2021 5:00 PM 
Document Collection: JOC FM22 Main Campus General Renovation and Modernization (Prequalification of Contractor)
  
JOC FM22 Main Campus General Renovation & Modernization (Prequalification of Contractor)W10061516 / FM22 / P4L-20912/14/2021 12:00 PM 
Document Collection: Hubbs Hall Roof Replacement (Prequalified Contractors Only)
  
Hubbs Hall Roof Replacement (Prequalified Contractors Only)1001082931 / P4L-22712/9/2021 2:00 PM 
Document Collection: 5372 YORK HALL SEISMIC IMPROVEMENTS _ CMGC Subcontractor Bid
  
5372 YORK HALL SEISMIC IMPROVEMENTS _ CMGC Subcontractor Bid537212/8/2021 11:00 AM 
Document Collection: SEAWATER CONTROLS PROJECT (Prequalified Contractors)
  
SEAWATER CONTROLS PROJECT (Prequalified Contractors)1000524384/P4L-21712/7/2021 2:00 PM 
Document Collection: Hillcrest Campus Redevelopment Phase 1- Prequalified Subcontractor Bidding (Wave 5A)
  
Hillcrest Campus Redevelopment Phase 1- Prequalified Subcontractor Bidding (Wave 5A)517112/6/2021 2:00 PM 
Document Collection: DISTRIBUTED ENERGY RESOURCES (DER) CONNECTS AND MICROGRID (BERT Lighting Controls Subpackage)
  
DISTRIBUTED ENERGY RESOURCES (DER) CONNECTS AND MICROGRID (BERT Lighting Controls Subpackage)5433 / 0PZ5-001211/29/2021 5:00 PM 
Document Collection: Hillcrest Campus Redevelopment Phase 1- Prequalified Subcontractors - Bid Package 03300 Concrete and Reinforcing Steel
  
Hillcrest Campus Redevelopment Phase 1- Prequalified Subcontractors - Bid Package 03300 Concrete and Reinforcing Steel517111/23/2021 2:00 PM 
Document Collection: Pepper Canyon 4F Sanford Institute Renovation (88706) and Pepper Canyon 2F TI (93436) (Prequalification of Contractor)
  
Pepper Canyon 4F Sanford Institute Renovation (88706) and Pepper Canyon 2F TI (93436) (Prequalification of Contractor)88706 and 9343611/19/2021 12:00 PM 
Document Collection: Hillcrest Campus Redevelopment Phase 1- DPR Subcontractor Prequalification (Wave 6A)
  
Hillcrest Campus Redevelopment Phase 1- DPR Subcontractor Prequalification (Wave 6A)517111/18/2021 2:00 PM 
Document Collection: DISTRIBUTED ENERGY RESOURCES (DER) CONNECTS AND MICROGRID (Metasys Subcontractor Bid- Prequalified Subcontractors)
  
DISTRIBUTED ENERGY RESOURCES (DER) CONNECTS AND MICROGRID (Metasys Subcontractor Bid- Prequalified Subcontractors)5433 / 1N0N-003011/17/2021 2:00 PM 
Document Collection: GEISEL LIBRARY REVITALIZATION INITIATIVE (Prequalified Subcontractors - BP 9.29 Framing,  BP 9.50 Ceilings)
  
GEISEL LIBRARY REVITALIZATION INITIATIVE (Prequalified Subcontractors - BP 9.29 Framing,  BP 9.50 Ceilings)5195 / 96291011/17/2021 2:00 PM 
Document Collection: GEISEL LIBRARY REVITALIZATION INITIATIVE  (Swinerton's Prequalified Subbid Packages)
  
GEISEL LIBRARY REVITALIZATION INITIATIVE  (Swinerton's Prequalified Subbid Packages)5195 / 1905409411/16/2021 1:00 PM 
Document Collection: 5451 JMC Fire Alarm Pull Station Modifications_Contractor Prequalification
  
5451 JMC Fire Alarm Pull Station Modifications_Contractor Prequalification545111/15/2021 4:00 PM 
Document Collection: CAMPUS DOMESTIC WATER INFRASTRUCTURE UPGRADES –  RIDGE WALK AND HOPKINS LANE (Prequalification of Contractors)
  
CAMPUS DOMESTIC WATER INFRASTRUCTURE UPGRADES –  RIDGE WALK AND HOPKINS LANE (Prequalification of Contractors)525611/9/2021 4:00 PM 
1 - 30Next