Bid Information for Job: East Campus Parking Structure 2 (Design-Builder Prequalification)

Project Number4777
Project NameEast Campus Parking Structure 2 (Design-Builder Prequalification)
Bid Date8/16/2013 4:00 PM
Mandatory Meeting: Yes8/7/2013 10:30 AM
Project Description
Subject to conditions prescribed by the University of California, San Diego (University), responses to the University's prequalification documents for a Design-Build contract are sought from proposers for the following project:

EAST CAMPUS PARKING STRUCTURE 2
UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No. 4777/A4L-369/966619
Estimated Construction Cost: $18,000,000

PREQUALIFICATION OF PROSPECTIVE PROPOSERS

The University's primary objective in utilizing the Design-Build approach is to bring the best available integrated design and construction experience to this project.  The University has determined that proposers who submit proposals on this project must be prequalified.  Prequalified proposers will be required to have the following California contractor's license:  B - General Building Contractor

PROJECT DESCRIPTION:

The East Campus Parking Structure 2 will be located on the University’s East Campus on the east side of the Shiley Eye Clinic on existing parking lot P756.

Facilities Design & Construction (FD&C) will prepare a Detailed Project Program (DPP) which will be issued through a Request for Proposals (RFP) to prequalified Design-Build (DB) teams. The DPP will include the program, budget, schedule, construction requirements, approved site boundary, and other design guidelines.

While the campus will require a minimum of 1,200 spaces to be provided for the established budget, DB teams will be strongly encouraged to maximize the number of parking spaces in their submitted designs.  To accomplish that maximization, the RFP will indicate that points will be awarded for additional spaces over the minimum of 1,200. This will create incentives for the DB teams vying for selection to provide as many spaces as economically feasible.

The project elements are:

A Design-Build Contract budget of $18M,
A site is approximately 3.2 acres,
A multi-level parking structure size containing a minimum of 1,200 spaces,
An option to incorporate a 2,000,000 gallon above-ground Thermal Energy Storage (TES) Tank, adjacent to the parking structure with an additional Design-Build budget of $3M.

Construction is to start directly after the IS/MND (mitigated negative declaration) is approved by the UC Office of President and other agency permits are given. This construction start date is anticipated in May 2014.

The University seeks Design-Build teams with demonstrated experience in construction and design of multi-level parking structures with an aesthetic component.  The Contractor shall have demonstrated annual business revenue of at least $50,000,000 for each and every one of the last five (5) consecutive years.  The anticipated contract time is eighteen (18) months from the NTP of Phase 1 to project completion.  Further requirements are outlined in the Prequalification Questionnaire.

For more information and to view and download Prequalification Questionnaires go to www.fdc.ucsd.edu/bids and click on the project.  Scroll to the bottom of the page to Prequalification Documents and click to open each file. 

Prequalification Questionnaires will be received only at the following address:

FACILITIES DESIGN & CONSTRUCTION
UNIVERSITY OF CALIFORNIA, SAN DIEGO
10280 N. Torrey Pines Road, Ste. 465
Contracts Department (MC 0916)
La Jolla, CA 92037
Attention: Carrie Robb, Contracts Specialist

No Prequalification Questionnaires will be received after 4:00 P.M., FRIDAY, AUGUST 16, 2013.

The University reserves the right to reject any or all responses to Prequalification Questionnaires and any or all proposals and to waive non-material irregularities in any response or proposal received.

All information submitted for prequalification evaluation will be considered official information acquired in confidence, and the University will maintain its confidentiality to the extent permitted by law.

Response to the Prequalification Questionnaire must be submitted on the forms contained within the Prequalification Questionnaire available at the address above.

All information requested in these forms must be provided in order to be considered "responsive" to the requirements of the prequalification.  The University contacts are Barbara Anderson, Project Manager, Facilities Design & Construction 858.534.4907 or Rhonda Mitchell, Contracts Manager, Facilities Design & Construction 858.822.3126.

A mandatory Prequalification Conference will be conducted on WEDNESDAY, AUGUST 7, 2013, at 10:30 A.M. at Facilities Design and Construction, 10280 N. Torrey Pines Rd., Ste 466, Large Conference Room, La Jolla, CA 92037.  Campus maps can be found at http://maps.ucsd.edu.

Attendance at the Prequalification Conference is mandatory for Contractors attempting to become prequalified to propose on this specific project.

Metered parking spaces are available (for up to 2 hours) in the service yard/shuttle stop parking lot and underground parking area of Torrey Pines Center South. Please allow ample time to secure parking. Contractors must be present for the entire conference.

UC San Diego encourages the participation of Small, Disadvantaged, Minority-owned, Women-owned and Service/Disabled Veteran-owned Business Enterprises (S/D/M/W/DVBE’s) and is committed to promote a diverse pool of firms for our building programs. Potential Proposers will be required to submit their small business outreach plan to the University as part of the prequalification process.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy.

Project ContactCarrie Robb (crobb@ucsd.edu)
Project Street Address10280 N. Torrey Pines Road, Ste. 465, La Jolla, CA 92037
Project Phone Number858.534.0774
Project Phone Number858.534.5633
Date Documents will be available7/29/2013
License RequirementB
Estimated Construction Cost$18,000,000
View All Properties
Edit Properties

4777 - East Campus Parking Structure 2

Bid Date

8/16/2013 4:00 PM

Project Number

4777

Project Name

East Campus Parking Structure 2 (Design-Builder Prequalification)

Project Description

Subject to conditions prescribed by the University of California, San Diego (University), responses to the University's prequalification documents for a Design-Build contract are sought from proposers for the following project: EAST CAMPUS PARKING STRUCTURE 2 UNIVERSITY OF CALIFORNIA, SAN DIEGO Project No. 4777/A4L-369/966619 Estimated Construction Cost: $18,000,000 PREQUALIFICATION OF PROSPECTIVE PROPOSERS The University's primary objective in utilizing the Design-Build approach is to bring the best available integrated design and construction experience to this project. The University has determined that proposers who submit proposals on this project must be prequalified. Prequalified proposers will be required to have the following California contractor's license: B - General Building Contractor PROJECT DESCRIPTION: The East Campus Parking Structure 2 will be located on the University’s East Campus on the east side of the Shiley Eye Clinic on existing parking lot P756. Facilities Design & Construction (FD&C) will prepare a Detailed Project Program (DPP) which will be issued through a Request for Proposals (RFP) to prequalified Design-Build (DB) teams. The DPP will include the program, budget, schedule, construction requirements, approved site boundary, and other design guidelines. While the campus will require a minimum of 1,200 spaces to be provided for the established budget, DB teams will be strongly encouraged to maximize the number of parking spaces in their submitted designs. To accomplish that maximization, the RFP will indicate that points will be awarded for additional spaces over the minimum of 1,200. This will create incentives for the DB teams vying for selection to provide as many spaces as economically feasible. The project elements are: A Design-Build Contract budget of $18M, A site is approximately 3.2 acres, A multi-level parking structure size containing a minimum of 1,200 spaces, An option to incorporate a 2,000,000 gallon above-ground Thermal Energy Storage (TES) Tank, adjacent to the parking structure with an additional Design-Build budget of $3M. Construction is to start directly after the IS/MND (mitigated negative declaration) is approved by the UC Office of President and other agency permits are given. This construction start date is anticipated in May 2014. The University seeks Design-Build teams with demonstrated experience in construction and design of multi-level parking structures with an aesthetic component. The Contractor shall have demonstrated annual business revenue of at least $50,000,000 for each and every one of the last five (5) consecutive years. The anticipated contract time is eighteen (18) months from the NTP of Phase 1 to project completion. Further requirements are outlined in the Prequalification Questionnaire. For more information and to view and download Prequalification Questionnaires go to www.fdc.ucsd.edu/bids and click on the project. Scroll to the bottom of the page to Prequalification Documents and click to open each file. Prequalification Questionnaires will be received only at the following address: FACILITIES DESIGN & CONSTRUCTION UNIVERSITY OF CALIFORNIA, SAN DIEGO 10280 N. Torrey Pines Road, Ste. 465 Contracts Department (MC 0916) La Jolla, CA 92037 Attention: Carrie Robb, Contracts Specialist No Prequalification Questionnaires will be received after 4:00 P.M., FRIDAY, AUGUST 16, 2013. The University reserves the right to reject any or all responses to Prequalification Questionnaires and any or all proposals and to waive non-material irregularities in any response or proposal received. All information submitted for prequalification evaluation will be considered official information acquired in confidence, and the University will maintain its confidentiality to the extent permitted by law. Response to the Prequalification Questionnaire must be submitted on the forms contained within the Prequalification Questionnaire available at the address above. All information requested in these forms must be provided in order to be considered "responsive" to the requirements of the prequalification. The University contacts are Barbara Anderson, Project Manager, Facilities Design & Construction 858.534.4907 or Rhonda Mitchell, Contracts Manager, Facilities Design & Construction 858.822.3126. A mandatory Prequalification Conference will be conducted on WEDNESDAY, AUGUST 7, 2013, at 10:30 A.M. at Facilities Design and Construction, 10280 N. Torrey Pines Rd., Ste 466, Large Conference Room, La Jolla, CA 92037. Campus maps can be found at http://maps.ucsd.edu. Attendance at the Prequalification Conference is mandatory for Contractors attempting to become prequalified to propose on this specific project. Metered parking spaces are available (for up to 2 hours) in the service yard/shuttle stop parking lot and underground parking area of Torrey Pines Center South. Please allow ample time to secure parking. Contractors must be present for the entire conference. UC San Diego encourages the participation of Small, Disadvantaged, Minority-owned, Women-owned and Service/Disabled Veteran-owned Business Enterprises (S/D/M/W/DVBE’s) and is committed to promote a diverse pool of firms for our building programs. Potential Proposers will be required to submit their small business outreach plan to the University as part of the prequalification process. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy.

View All Properties
Edit Properties

  
  
  
collapse Content Type : Document ‎(4)
4777.Prequal.Advertisement.pdf
  
28 KB
4777.Prequal.Questionnaire.doc
  
853 KB
4777.RFQ.Addendum.1.PDF
  
1402 KB
4777.Sign-In.Sheet-Mandatory.Prequal.Mtg.pdf
  
3291 KB
NameAddressPhone #Contact
McCarthy Building Companies, Inc.
Hensel Phelps Construction Co.
Rudolph and Sletten, Inc.